Fit out BRUKL for Part L target emissions and Level 5 EPC on completion of the landmark new John Lewis at New Street station.
Non domestic EPC for new lease
Designbuilder modelling and BRUKL (including compliance advice) were provided for this landmark new hotel fronting the Old Trafford cricket pitch
Coles Knapp provided the Non Domestic EPC on completion of construction for this stunning new visitor centre at the National Memorial Arboretum.
Non domestic EPC provided for managing agents
Coles Knapp provided the Non Domestic EPC for the new lease at this well known office building central in Denbigh
Coles Knapp provided the RdSAP EPCs for 270 flats in the three blocks in Flint, North Wales to enable the carbon savings for ECO to be calculated for the proposed external wall insulation and new windows. We used a robust sampling methodology to ensure minimum disruption to the residents.
Non domestic EPCs provided for vacant suites in this office tower.
SAP calculations and Part L compliance, plus SAP EPCs on completion. 83 luxury new dwellings on the former hospital site for Pure Residential & Commercial. This project include re-running multiple times to attain a TER pass that worked across all house types yet kept one cost effective specification across the site.
We assisted with the HVAC design compliance with this landmark hotel from an early stage after the proposed CHP was dropped from the project. Compliance was obtained by utilising high efficiency VRF sytems throughout the building as PV was not a serious option due to the rooftop five-a-side pitch. Coles Knapp also provided the As Built compliance and EPC.